|
|
My RV-8 build
|
Date: 4-21-2010
|
Number of Hours: 1.50
|
Manual Reference: Page 6-4
|
Brief Description: Finished final drilling the VS skins
|
|
Clecoed the VS 808PP spar doubler to the VS 803PP along with the 410, 411, and 412 hinge brackets. Used the VS 803 and 808 as a guide and drilled the two holes for the VS 410 hinge bracket. Fluted and deburred the ribs and clecoed.
Final drilled the VS 803, 808, 410, 411, and 412 to #30 as well as the rib spar attach holes.
Clecoed the VS 801 skin to the assembly, final drilled the skin.
Now to disassemble, debur, dimple, countersink, clean prime and rivet.....
|
|
Final drilling the skin
|
|
|
|
VS final drilled.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |